Replacement construction of the Eisern valley bridge – A45 is progressing.
Here you can see the concreting of the roadway slab superstructure south cycle 2.
64 tons of reinforcing steel and 9 tons of prestressing steel had to be installed for the carriageway slab.
A total of 430m³ of concrete was installed in 11 hours.
This required 12 concrete mixing trucks that were constantly in circulation.

Our services: construction management, construction supervision